ADDENDUM #4 - PACKAGE 3: Condos
Bids Due: 12:00 Noon - December 21, 2010


Additional comments from user Jared Oldroyd:

The following documents are included in Pre-Bid Addendum #4 for the City Center DC Package 4/Condo Buildings. Receipt and review of this Addendum must be acknowledged on all bid forms that are submitted for evaluation by Clark/Smoot. Addendum #4 documents include:

  1. Package 3 - SBA Addendum #2 Drawings and Specifications, by Shalom Baranes Associates dated December 10, 2010.
  2. Package 3 Exhibit A, revised December 16, 2010.

You can access this content either by clicking on the link below, or by copying and pasting it into your browser.

https://sites.clarkus.com/LotusQuickr/citycenter/ PageLibrary852577B400510CC7.nsf/h_Toc/ 92A25C23BC2A0DA2852577FB004D1FED/?OpenDocument



ADDENDUM #3 - PACKAGE 3: Condos
Bids Due: 12:00 Noon - December 21, 2010


Additional comments from user Jared Oldroyd:

The following documents are included in Pre-Bid Addendum #3 for the City Center DC Package 3/Condo Buildings.  Receipt and review of this Addendum must be acknowledged on all bid forms that are submitted for evaluation by Clark/Smoot.  Addendum #3 documents include:

  1. CityCenterDC Package 3 Condo Buildings Preliminary Schedule dated December 13, 2010.
  2. CityCenterDC Prebid RFIs dated December 13, 2010.

You can access this content either by clicking on the link below, or by copying and pasting it into your browser.

https://sites.clarkus.com/LotusQuickr/citycenter/ PageLibrary852577B400510CC7.nsf/h_Toc/ B9B275B51BF72DC7852577FA004754AC/?OpenDocument



ADDENDUM #2 - PACKAGE 3: CONDOS
Bids Due: 12:00 Noon - December 16, 2010


Additional comments from user Jared Oldroyd:

Announcement: The bid date for CityCenterDC Package 3 Condominiums has been changed to Tuesday, December 21, 2010. All other CityCenterDC bid dates will remain as scheduled.

The following documents are included in Pre-Bid Addendum #2 for the City Center DC Package 3/Condo Buildings. Receipt and review of this Addendum must be acknowledged on all bid forms that are submitted for evaluation by Clark/Smoot. Addendum #2 documents include:

  1. Package 3 Exhibit A, dated December 6, 2010.
  2. Instructions to Bidders – Package 3 Condominium Buildings, dated December 8, 2010. (incorporates new bid date)
  3. Bid Form – Package 3 Condominium Buildings, dated December 6, 2010. (incorporates updated alternates and unit prices)

You can access this content either by clicking on the link below, or by copying and pasting it into your browser.

https://sites.clarkus.com/LotusQuickr/citycenter/ PageLibrary852577B400510CC7.nsf/h_Toc/ BC2FF8B8B190BB71852577F400002433/?OpenDocument



ADDENDUM #1 - PACKAGE 3: CONDOS
Bids Due: 12:00 Noon - December 16, 2010


Additional comments from user Jared Oldroyd:

The following documents are included in Pre-Bid Addendum #1 for the City Center DC Package 3/Condo Buildings. Receipt and review of this Addendum must be acknowledged on all bid forms that are submitted for evaluation by Clark/Smoot. Addendum #1 documents include:

  1. Package 3 Addendum #1 by Shalom Baranes Associates dated November 29, 2010.
  2. CityCenterDC Prebid RFIs, dated December 3, 2010.

You can access this content either by clicking on the link below, or by copying and pasting it into your browser.

https://sites.clarkus.com/LotusQuickr/citycenter/ PageLibrary852577B400510CC7.nsf/h_Toc/ 0B2D4FCB25EC770F852577EF0006FD63/?OpenDocument


PACKAGE 1 INVITATION TO BID: OFFICE BUILDINGS
Bids Due: 12:00 Noon – January 6, 2011


This is the last of the four bid packages.

Package 1 includes the two (2) Office Buildings (approximately 500,000 SF total); Construction will start in the second quarter of 2011.

Trades include: masonry, structural steel, miscellaneous metals, ornamental metals, rough carpentry, architectural woodwork, countertops, roofing, waterproofing, air barrier, joint sealants, expansion joint covers, doors, frames, hardware, louvers, interior glass, metal panels, drywall, flooring, tile, painting, fireproofing, appliances, toilet compartments, toilet accessories, postal specialties, fire protection specialties, entrance mats, wire mesh partitions, façade access equipment, landscaping, mechanical, electrical, fire protection, controls, and telecom.

Note that CIP concrete, elevators, stone, and curtain wall have been bid in a previous solicitation.

Instructions to Bidders
Owners Notice to Subcontractors and Suppliers
Bid Schedule



ADDENDUM #2 - PACKAGE 2: RENTALS
Bids Due: 12:00 Noon – December 2, 2010


The following documents are included in Pre-Bid Addendum #2 for the City Center DC Package 2/ Rental Buildings. Receipt and review of this Addendum must be acknowledged on all bid forms that are submitted for evaluation by Clark/Smoot.

Addendum #2 documents include:

  1. Package 2 Addendum #1 Supplement by Shalom Baranes Associates dated November 24, 2010. (includes Medicine Cabinet Revisions, Bathroom Wall Pad-out Revisions, and Lighting Revisions)
  2. CityCenterDC Pre-Bid RFIs for Package 2 Bid, dated November 25, 2010.
  3. Package 2 Exhibit A, dated November 25, 2010

You can access this content either by clicking on the link below, or by copying and pasting it into your browser.

https://sites.clarkus.com/LotusQuickr/citycenter/ PageLibrary852577B40061B014.nsf/h_Toc/ 7D85D189A766A044852577E60058ABA9/?OpenDocument



PACKAGE 3 INVITATION TO BID: CONDOS
Bids Due: 12:00 Noon – December 16, 2010


Package 3 includes the two (2) Condominium Buildings; Approximately 330,000 total gross square feet and approximately 216 units.

Instructions to Bidders
Owners Notice to Subcontractors and Suppliers
Bid Schedule



ADDENDUM #1 - PACKAGE 2: Rentals
Bids Due: 12:00 Noon - December 2, 2010


The following documents are included in Pre-Bid Addendum #1 for the City Center DC Package 2/ Rental Buildings. Receipt and review of this Addendum must be acknowledged on all bid forms that are submitted for evaluation by Clark/Smoot.

Additional comments from user Jared Oldroyd: Package 2 Rental Buildings - Addendum #1 has been posted.

You can access this content either by clicking on the link below, or by copying and pasting it into your browser.

https://sites.clarkus.com/LotusQuickr/citycenter/PageLibrary 852577B40061B014.nsf/h_Toc/F74E1C57F3610ED2852577E400011B32/?OpenDocument



PACKAGE 2 INVITATION TO BID: RENTALS
Bids Due: 12:00 Noon - December 2, 2010


Package 2 includes the two (2) Residential Rental Buildings. Approximately 500,000 total gross square feet and approximately 450 units.

Instructions to Bidders
Owners Notice to Subcontractors and Suppliers
Bid Schedule
Estimator Assignments



ADDENDUM #1 - PACKAGE 4: GARAGE, SITE WORK, STRUCTURE, ELEVATORS
Bids Due: 12:00 Noon – November 18, 2010


Addendum #1 for Package 4 has been posted. Please review and incorporate this Addendum into your forthcoming proposal submissions. As a reminder, please submit scope checklists to the applicable trade estimator on Tuesday, November 16th, 2010 and submit final proposals on Thursday, November 18th, 2010 by 12 noon.

You can access this content either by clicking on the link below, or by copying and pasting it into your browser.

https://sites.clarkus.com/lotusquickr/citycenter/pagelibrary852577b40050 A5B6.nsf/h_577EC1D3BCA283B8852577D10074B120/A3F5D2FC4052B76 2852577D8006E` 3D35/?OpenDocument



PACKAGE 4 INVITATION TO BID: GARAGE, SITE WORK, STRUCTURE, ELEVATORS
Bids Due: 12:00 Noon - November 18, 2010


Instructions to Bidders
Owners Notice to Subcontractors and Suppliers
Bid Schedule
Bid Form Package 4
Estimator Assignments



PRE-SOLICITATION NOTICE


CLARK I SMOOT AT CITY CENTER, A JOINT VENTURE (JV) invites you to submit a bid for everything in your line of work for the following project:

CityCenterDC
Washington, DC

Bid Timeline: Please click the link below to view the bid schedule for specific timing. The project will be bid in four (4) packages, with the first package being issued on Monday, October 18, 2010. Subsequent packages will be issued every two weeks. Separate Bid Package Solicitations will be issued for each package. Please see the attached letter from Hines/Archstone outlining the process for the upcoming procurement.

Project Description: Located at the site of the former DC Convention Center in Washington, DC. Project contains two (2) Office Buildings [500,000sf total], two (2) Rental Apartment Buildings [500,000sf total], two (2) Condominium Buildings [330,000sf total], and a [900,000sf] Below Grade Parking Garage, as well as an extensive site work package. Construction will start in the second quarter of 2011. Trades include: Earthwork, support of excavation, concrete paving, bit paving, site utilities, plantings, CIP, precast, masonry, terra cotta rain screen, misc metals, rough carpentry, millwork, waterproofing, metal panels, roofing, caulking, metal doors and frames, glass and glazing, drywall, tile, resilient and carpet flooring, fireproofing , painting, toilet compartments, access flooring, extinguishers, toilet accessories, window washing equipment, residential appliances, residential cabinets, loading dock equipment, entrance mats, elevators, mechanical, electrical, fire protection, duct bank, concrete sealer, and final cleaning.

Drawings and Specifications: Information on how to obtain drawings will be issued with each Bid Package Solicitation. Drawings will not be available prior to the 'Documents Issued' date for each package as indicated on the attached bid schedule.

Certified Business Enterprise (CBE) Requirements: It is a Project requirement that 35% of the work be performed by Certified Business Enterprises (CBE's) as certified by the District of Columbia's Department of Small and Local Business Development (DSLBD). Clark/Smoot will consider the Bidder's CBE participation plan as a material factor in its determination of the lowest, most responsive and best value bid received. We encourage meaningful joint ventures between CBE and non-CBE firms. We encourage bids from small, disadvantaged, minority and woman-owned subcontractors and suppliers.

Please access the links below for detailed information on this Pre-solicitation Notice.

 

CCDC_Presolicitation_v2 Bid Sched (2) (PDF - 24kb)
CCDC_Presolicitation_v2 Notice Pkg (2) (PDF - 924kb)